Case Studies

BAE Systems, Glasgow

Overview

This naval dockyard on the Clyde required extensive roof guardrail as well as plastic rooftop walkway to provide safe access to maintenance personnel. Working in close partnership with our distributor, APS Safety Systems of Glasgow, we supplied 500 metres of Evorail Top-Fix Guardrail and 700 metres of Evowalk.

The Evowalk system required a combination of Standard Composite Walkway, Stepped Walkway and also the design of levelling brackets to enable the walkway to be fitted into valleys between the pitched roofs. Finally, our Front Fix Evorail was fitted to allow the Pitched Roof walkway to be installed as close to the roof edge as possible.

The complete system has now been delivered and APS will be installing during the final months of 2011.